OL 90 N

Additional locking mechanism for OL 90 N / OL 95 * Additional locking mechanism for 0 - 17 mm overlap heights

Additional locking OL 90 N, OL 95 Accessories
  • Visible locking mechanism - component on the frame engages with component on the leaf
  • Improvement of tightness and safety
  • No on-site central locking required for safe locking
  • Can be operated with the hand lever, crank and E 212
Contact us

Application Areas

  • Locking mechanism on the rectangular, pitched and triangular window
  • Can be used in combination with an OL 90 N and OL 95 scissor
  • Installation on wooden, plastic and aluminium windows
  • Frame and leaf installation

Technical data

Additional locking mechanism for OL 90 N / OL 95
Leaf width (min.) 380 mm

Downloads

Variants & Accessories

Contact

GEZE Central +385-1-3773540 GEZE Service +385-9-1604-9737 Hotline for architects +385-9-1255-5022