Guide rail 2-leaf

TS 5000 L-ISM ECline * Overhead door closer system with guide rail for barrier-free, easy-to-open double leaf doors up to 1250 mm leaf width in accordance with DIN 18040 with integrated closing sequence control

Overhead door closer with guide rail system TS 5000 ISM Door closer for double leaf doors with closing sequence control and with integrated back check, which causes the strongly opened doors to be slowed down.
  • System with two door closers TS 5000 ECline and an ISM guide rail assembly
  • Barrier-free in accordance with DIN 18040 up to EN 5 (1250 mm leaf width)
  • Closing force of EN 3-5 with variable adjustment
  • Can be used for right and left hand doors without conversion
  • Closing sequence control holds the active leaf in the waiting position until the passive leaf is closed
  • Hydraulic latching action which accelerates the door shortly before it is closed
Show more
  • Closing speed can be individually adjusted
  • Integrated back check, slows down doors that are thrown open forcefully
  • Visual closing force display for easy control of the setting
  • All functions can be adjusted from the front and less installation time compared to standard systems
Contact us

Application Areas

  • Fire and smoke protection doors
  • Right and left double leaf single-action doors
  • Symmetrical and asymmetrical division of door possible
  • Single-action doors up to 2500 mm hinge clearance and 1250 mm leaf width
  • Minimum hinge clearance 1300 mm, minimum width of passive leaf 400 mm
  • Door leaf installation opposite hinge side
  • Access for all in accordance with DIN 18040 up to EN 5

Technical data

TS 5000 L-ISM ECline
Barrier-free in accordance with DIN 18040 up to leaf width (max.) in mm 1250 mm
Leaf width (max.) 1250 mm
Type of installation Door leaf installation opposite hinge side
Opening angle (max.) 130 °
Minimum hinge clearance 1360 mm
Minimum passive leaf width 380 mm
Suitability for fire protection doors Yes
Closing force adjustable Yes, stepless
Adjustable closing speed Yes
Latching action adjustable Yes, via valve
Back check integrated Yes, hydraulically adjustable
Position of closing force adjustment Front
Visual closing force display Yes
Hold-open function Optional
Closing sequence control integrated Yes

Downloads

Contact

GEZE Central +385-1-3773540 GEZE Service +385-9-1604-9737 Hotline for architects +385-9-1255-5022